0.1毫米,端麵(miàn)間隙沿圓(yuán)周上的不同心度(dù)允差為0.1毫米(mǐ),端麵間隙沿圓周的不均勻允差0.3毫米(連接進出水管路後再(zài)分別校核一遍,仍符合上述要求)

    6、在檢查電機轉向與天天操B夜夜操B的轉向一致後,裝上聯軸器的聯接柱(zhù)銷;

    7、不要把泵本身作為管路支撐點,管(guǎn)路應(yīng)在泵的附近設可靠支撐。

    以上為不帶底座的天天操B夜夜操B機組的安(ān)裝方法。

    對於配(pèi)帶公共底座的泵,基礎與底座之間(jiān)保留45毫(háo)米的間隙,用調整螺釘精確地調(diào)整機(jī)組並在聯軸器處對中。其安裝(zhuāng)原則與不帶公共底座的(de)機組(zǔ)相同。

五、起動、停(tíng)止和運行

    1、起動:

    1)、起動前的檢查:

    a).泵或底座是否與(yǔ)基礎(chǔ)緊固;

    b).聯軸(zhóu)器與泵機(jī)組是否校正;

    c).管路是否按要求連接;

    d).手是否能容易地轉動轉子;

    e).是否所有軸承(chéng)都有良好的潤滑(huá)。

    2)、起動前(qián)關閉出口閥,用介質灌注排盡(jìn)泵和管路內的空氣。吸入(rù)狀況時,用泵體上部(bù)的螺(luó)塞排氣。在倒灌時(shí)泵也須排空;

2運行:

   1)、當壓力表壓力升高,慢慢打開出口閥;

   2)、打開所有輔助管路,並檢查流量;

   3)、泵是填料密封運行時,填料(liào)還(hái)處允許有(yǒu)多少(shǎo)量,滴(dī)水,輕輕壓緊填料壓蓋至少(shǎo)量滴水。

4)、為防止介質升溫,泵不能在(zài)出口閥門

    5. After the concret solidifed, again correct the coaxial degree in the excircle of the two couplings, the error of the correction is not more than O.1 mm, the allowable error of the inhomo-geneous degree of the endface clearance along the circle is 0.3mm,  Re- inspect the correct pricision after tightening the foot unts,  finally, pour concret fuly nuder the foot of the pump and the motor except the around of the wedge shaped cushion.

    6. After check the rotary direction of the motor which is now in keeping with that of the pump,  you can install the connecting parallel pin of the coupling.

    7. The inlet pipe and outlet pipe should be supported by a brasket instead of the pump casing.

    Above all the mentioned methods and requirements are suitable for the pump set without common bedplate.

    Samely,  for the pump set with common bedplate. Fit the pre -assembled set with foun-dation bolts loosely inserted in the cut- outs in the foundation and align. There must be a 4-5cm gap between the top of the foundation and the bottom of the baseframe. Precisely align the set using the adjusting screws and check alignment on the coupling. Others you can refer to the above mention methods.

V. STARTING, STOPPING ADN RUNNING

     1. Starting:

     1 ). Before starting up the pump make sure that the following requirements have  been checked and fulfilled.

     a). Has the pump been firmly bolted to the base/foundation?

     b) . Have the coupling and pump unit been aligned as specified?

     c). Are the pipes properly fitted?

     d) . Can the unit be easily rotated by hand at the coupling? (Carry out at least one full rotation)

     e). Has lubrication been provided for oil-lubricated bearings?

     2)Before the pump is started up, it and the pipes must be vented and filled with the liquid to be pumped. In the case of both gravity feed and suction operation venting must be carried out via the hole on the upper suction elbow. In the case of suction operation the upum must

天天操B夜夜操B,17.com.羞羞视频在线观看,韩国天天视频69,精品久久跳转17c,日本熟女系列89,天天久久综合9191,99人人精品一二视频,在线看片www3344